Capabilities

BIM governance and integrated digital delivery.

Eight capabilities that run as one thread — from the information requirements set at the beginning of a project to the structured asset information handed to the operator at the end.

One governed delivery structure. Named specialists. Clear accountability.
Core Capabilities

What we govern, integrate and deliver.

01

BIM governance and strategy

Information requirements, BIM execution planning, delivery standards and the governance structure that holds a project's information to an institutional standard.

02

Information management and ISO 19650-aligned delivery

Common data environment operation, naming and classification, status coding, exchange control, MIDP and TIDP — aligned to ISO 19650 principles.

03

BIM management, model production and coordination

Discipline model development from LOD 200 through LOD 500, federation, clash management, issue control and model acceptance across every package.

04

Engineering design integration

Multidisciplinary structural, architectural, civil and electromechanical design brought into one coordinated information environment through the alliance.

05

Model-based shop drawings and construction support

Shop drawing production from coordinated models, builder's-work information, penetrations, supports and equipment-access documentation.

06

4D planning and project intelligence

Sequence simulation linked to the delivery programme, plus portfolio and project dashboards that make status, readiness and risk legible to leadership.

07

As-built, asset information and FM-ready handover

Record models reconciled against verified survey output, structured asset registers, and a digital handover the operator can actually use.

08

Digital twin readiness and operational information structures

Preparing asset information so an operational digital twin is possible — structure, classification and governance before platform selection.

The Information Lifecycle

One thread, from requirements to handover.

Each stage is defined, evidenced and accepted before the next depends on it. That is what makes the handover at the end worth having.

01

Requirements

Information requirements defined against how the asset will be built and operated.

02

BEP & CDE

Execution plan, common data environment, naming, classification and exchange control.

03

Coordinated models

Discipline models federated, clash-managed and accepted at each gate.

04

Shop drawings

Model-based construction documentation issued from the coordinated model.

05

4D & controls

Sequence simulation and project intelligence aligned to the reporting cycle.

06

As-built

Record information reconciled against verified site and survey output.

07

FM-ready handover

Structured asset information handed to the operator, not a folder of files.

Cross-cutting Capability

Executive governance and decision readiness.

Technical delivery is only half the problem. Above it sits the question of whether an institution's leadership can actually decide — with information it trusts, through a decision path that is clear, at the moment the decision is needed. BIM MENA works at that level as well, led by Dr. Manal Aladwani, with Bader Alabddan contributing decision-intelligence and AI-governance components.

01

Institutional decision quality

How executive decisions are framed, evidenced, owned and closed — and where the friction sits in that path today.

02

Digital transformation governance

Governance for transformation programmes, so investment in platforms follows a decision structure rather than preceding one.

03

Trusted project and asset information

Data governance and information reliability as the precondition for any decision leadership is asked to sign.

04

AI readiness and AI governance

Whether the institution's information can responsibly carry AI, and the governance under which it would be adopted.

05

BIM as decision support

BIM and project information management treated as supporting tools for executive decisions — not as ends in themselves.

06

Facilitated executive dialogue

Structured executive sessions that surface leadership observations and priorities, closing with an indicative 90-day action roadmap.

The scope and depth of executive advisory are defined for each engagement, with any diagnostic, assessment or implementation work separately agreed.

How We Work

A structured, governance-led delivery approach.

Define
Information requirements established against how the asset will be built, commissioned and operated — before production begins.
Plan
BIM execution plan, common data environment, naming, classification, status coding and the delivery programme for information.
Produce
Discipline models and documentation produced to defined levels of information need, by named parties with named accountability.
Coordinate
Federation, clash management, issue control and interface resolution — every interface owned on both sides.
Validate
Model acceptance and quality checks at each gate. Nothing advances on assertion; it advances on evidence.
Hand over
Record information reconciled against verified output, structured for asset management and operational use.

Standards. Delivery is structured in alignment with applicable ISO 19650 principles and the project-specific information requirements and BIM execution plan.

Specialist delivery. Technical disciplines are performed by appropriately qualified and accountable parties within the governed delivery structure.

Begin

Let's talk about the project you need to govern.

Every engagement begins with a confidential read of the asset, the information you already hold, and the accountability the project requires.

Discuss a project →